Contact | Sitemap | FAQ | Legal Terms
Login to Webmail
Lufthansa Malta News, Lufthansa Malta Events

A320 Main Landing Gear Rib 5 Fitting modification and replacement at LTM

18 January 2012

During Dec 2011, LTM performed a main landing gear rib 5 modifications and replacement on a 13 year old airbus A320 aircraft which was undergoing scheduled maintenance in one of its hangars. The refit involves several complex engineering tasks to re-assure structural integrity once the aircraft is returned to operation. Although LTM had carried repairs on the rib 5 structure in the past this significant structural refit was the first to be carried out by LTM maintenance team.

landing gear rib support structure.jpg

Go Back Go to Top Go Back
© Lufthansa Technik Malta